জনপ্রশাসন মন্ত্রণালয় || অফিস সহকারী কাম-কম্পিউটার মুদ্রাক্ষরিক (23-09-2023) || 2023

All

Created: 3 months ago | Updated: 9 hours ago

His school is adjacent to his home.

Fill in the blanks:
2.

The pen belongs ____ me.

Created: 3 months ago | Updated: 9 hours ago

The pen belongs to me. 

Created: 3 months ago | Updated: 6 hours ago

The exam will commence  on the 25th September.

Created: 3 months ago | Updated: 9 hours ago

He has disliking for dogs. 

Fill in the blanks:
5.

He is good ____ tennis.

Created: 3 months ago | Updated: 9 hours ago

He is good at tennis.  

Write the following sentence correctly:
6.

I receive your letter yesterday.

Created: 3 months ago | Updated: 9 hours ago

 I receive your letter yesterday. 

=I received your letter yesterday

Write the following sentence correctly:
7.

Food nourish our body.

Created: 3 months ago | Updated: 9 hours ago

Food nourish our body.

= Food nourishes our body

Write the following sentence correctly:
8.

He arrive before his father went home.

Created: 3 months ago | Updated: 9 hours ago

He arrive before his father went home. 

=He had arrived before his father went home.

Write the following sentence correctly:
9.

They work for two hours.

Created: 3 months ago | Updated: 9 hours ago

They work for two hours.

=They have been working for two hours.

Write the following sentence correctly:
10.

No body salute the setting sun.

Created: 3 months ago | Updated: 9 hours ago

No body salute the setting sun.

=No one / Nobody salutes the setting sun.

Created: 3 months ago | Updated: 9 hours ago

 I was advised to take regular exercise by the doctor. 

=The doctor advised me to take regular exercise.

Change the voice :
12.

What do you want?

Created: 3 months ago | Updated: 9 hours ago

What do you want?

=What is wanted by you?

Change the voice :
13.

He ran a race.

Created: 3 months ago | Updated: 9 hours ago

He ran a race. 

=A race was run by him.

Created: 3 months ago | Updated: 9 hours ago

Promises should be kept. 

= One should keep one's promises

Created: 3 months ago | Updated: 9 hours ago

He will teach the subject.  

=The subject will be taught by him

Make sentences with meaning:
16.

Catch a tarter

Created: 3 months ago | Updated: 9 hours ago

Catch a tarter( শক্তিশালী লোকের মুখোমুখি হওয়া)

= I do not want to catch a tarter

Make sentences with meaning:
17.

Horns of a dilemma

Created: 3 months ago | Updated: 9 hours ago

Horns of a dilemma (উভয়সঙ্কট) 

= The bird is caught on the horns of a dilemma

Make sentences with meaning:
18.

In sackcloth and ashes

Created: 3 months ago | Updated: 9 hours ago

In sackcloth and ashes (অনুশোচনা)

= He stood before us in sackcloth and ashes

Make sentences with meaning:
19.

Sheet anchor

Created: 3 months ago | Updated: 9 hours ago

Sheet anchor (হাতের পাঁচ)

This small piece of land is his sheet anchor; he does not want to part with it.

Make sentences with meaning:
20.

Up and doing

Created: 3 months ago | Updated: 9 hours ago

Up and doing (কর্মঠ)

= You should be up and doing.

Created: 3 months ago | Updated: 9 hours ago

Padma Bridge The longest bridge in Bangladesh is the Padma Multipurpose Bridge. This dream Padma Bridge is the biggest  project implemented by Bangladesh without any foreign aid. It is the largest project in the country and will be  the longest bridge in the country after construction. The bridge is being constructed with concrete and steel. The length of the main bridge is 6.15 km and the width is 16.10 m. The bridge connecting Mawa in Munshiganj  district to Jajira in Shariatpur district has two layers. It has a four-lane road at the top and a railway at the  bottom. The Padma Bridge will be used for rail, gas, power lines and fiber optic cable expansion in the future. The complete design of the Padma Multipurpose Bridge was formed by a team of international and national  consultants led by ECOM. A company called China Major Bridge, a subsidiary of China Railway Group  Limited, has been contracted to build the bridge. Construction began on December 6, 2014, and by November  2020, 92% of the bridge was completed.

According to China Major Bridge Engineering Company, the contractor constructing the Padma Bridge, the  Padma Bridge will be ready for traffic by April 2022. The project will directly benefit more than 30 million  people (44,000 sq km which is 29% of the total area of Bangladesh). Completion of this bridge at a cost of over Tk 30,000 crore will make a significant contribution to the social,  economic and industrial development of the southern part of Bangladesh. The bridge will play an important  role in regional connectivity between Asia and Southeast Asia. The Padma Bridge, the dream of the people of  Bangladesh, is on the way to be realized today.

Although the World Bank and donors withdrew due to allegations of corruption, the Bangladesh government  did not back down. The government decided to build the bridge with its own funds and the work is progressing  accordingly. Work on the Padma Bridge is progressing at a normal pace. Everyone concerned is hoping that  the construction work of the bridge will be completed within the stipulated time.

Related Sub Categories