Joint Recruitment Test for 6 Banks || Senior Officer (02-08-2019) || 2019

All

Let us depict the rectangular plot according to question

Let, the width of the plot is x meter

Length of the plot is (x + 2) meter

According to question

3x + 240 = x(x + 2)

=3x+240=x²+2x

=x2-x-240=0

=x2 - 16x + 15x - 240 = 0

=x(x-16)+15(x-16)=0

=(x - 16)(x + 15) = 0

=Here r - 16 = 0

x = 16

x + 15 = 0

⇒x=-15 is not acceptable

 Area of the plot = x(x+2)m² = 16(16+2)m² = 16 x 18=288m² (answer).

Here, 0.9 hours = 0.9 * 60 = 54 minutes; 0.7 hours = 0.7 x 60=42 minutes

2.5 hours = 2.5 x 60 = 150 minutes

In 54 minutes first pipe can fill=15054=259part of the tank

And in 42 minutes another pipe can empty = 15042 = 257 part of the tank

As, the tank was filled, after opening both the tank will be filled to

=1+259-257=63+175-22563=238-22563=1363part Empty part =1-1363=63-1363=5063

According to question

5063 parts of tank = 450 liters

1 or full part of tank =450×6350=567 liters.

To complete the work in time

In 8 days, required number of worker = 54

In 3 days, required number of worker = 54×83=144

Primarily, each worker got =324054=60 taka

Later, each worker got = 3240144 = 22.5taka

Each worker will receive = 60-22.5 37.5 Taka less. (Answer).

Let, the work was finished in x days.

A worked for x days

B worked for (x - 2) days

C worked for (x - 4) days

Now, A' s models day's work=x12part

B's 1 day's work=" x-218 part

C's 1 day's work = x-424 part

According to question,

=x12+x-218+x-424=1 =6x+4x-8+3x-1272=1 =13x-20=72 =13x=72+20=92 x=9213=7.07 x=7.077days (approximately) The work was completed in approximately 7 day.(answer)